|
|
Preliminary Maintenance Concept for the High Speed Link Paris-Bordeaux (2007 - 2008)
| Reference: |
Olaf Scholtz-Knobloch |
| Customer: |
Bilfinger Construction Company |
| Projectpartner: |
|
| Competences: |
Engineering |
| Division: |
System Design, Operation and Maintenance |
| Contact: |
Olaf Scholtz-Knobloch |
|
| Description: |
|
Elaboration of a preliminary maintenance concept for the whole infrastructure of the approx. 300 km high speed line Paris-Bordeaux (mainly with slab track), as basis for the elaboration of a BOT-Tender.
|
|
| More Information |
|
| Download: |
|
| Link: |
|
|