Preliminary Maintenance Concept for the High Speed Link Paris-Bordeaux (2007 - 2008)

Reference: Olaf Scholtz-Knobloch
Customer: Bilfinger Construction Company
Projectpartner:
Competences: Engineering
Division: System Design, Operation and Maintenance
Contact: Olaf Scholtz-Knobloch

 

Description:
Elaboration of a preliminary maintenance concept for the whole infrastructure of the approx. 300 km high speed line Paris-Bordeaux (mainly with slab track), as basis for the elaboration of a BOT-Tender.

 

More Information
Download:
Link: