|
Preliminary Maintenance Concept for the High Speed Link Paris-Bordeaux (2007 - 2008)
Reference: |
Olaf Scholtz-Knobloch |
Customer: |
Bilfinger Construction Company |
Projectpartner: |
|
Competences: |
Engineering |
Division: |
System Design, Operation and Maintenance |
Contact: |
Olaf Scholtz-Knobloch |
|
Description: |
|
Elaboration of a preliminary maintenance concept for the whole infrastructure of the approx. 300 km high speed line Paris-Bordeaux (mainly with slab track), as basis for the elaboration of a BOT-Tender.
|
|
More Information |
|
Download: |
|
Link: |
|
|